We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Signboard construction.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Signboard construction - List of Manufacturers, Suppliers, Companies and Products

Signboard construction Product List

1~2 item / All 2 items

Displayed results

Large Outdoor Sign Production: Steel Large Sign Construction

A case study of a large blue design sign supported by two poles!

We would like to introduce a case of producing a large outdoor sign for SBS My Home Center. It features a large blue design supported by two poles, made of steel, and the construction period was approximately three months. For the production, manufacturing, and installation of large signs and outdoor signs, please leave it to Mochizuki Nameplate Co., Ltd. in Shimizu Ward, Shizuoka City. 【Case Overview】 ■ Construction Period: August to October 2006 ■ Construction Duration: Approximately 3 months *For more details, please download the PDF or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large Outdoor Sign Production: Sheet Sign Construction

Leave the production, manufacturing, and installation of large signs and outdoor signs to our company in Shimizu Ward, Shizuoka City!

We would like to introduce a case of producing a large outdoor sign for Freedom. The construction site is located in Nakajima, Shizuoka City, and the size is 1,000mm x 6,200mm (double-sided), with the material being tarpaulin sheet. The construction period, including new sheet printing, was 20 days. We carried out the replacement of existing sheets and the exchange of internally illuminated fixtures. [Case Overview] ■ Construction Site: Nakajima, Shizuoka City ■ Size: 1,000mm x 6,200mm (double-sided) ■ Material: Tarpaulin Sheet ■ Construction Period: 20 days *For more details, please download the PDF or feel free to contact us.

  • Other contract services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration