Large Outdoor Sign Production: Steel Large Sign Construction
A case study of a large blue design sign supported by two poles!
We would like to introduce a case of producing a large outdoor sign for SBS My Home Center. It features a large blue design supported by two poles, made of steel, and the construction period was approximately three months. For the production, manufacturing, and installation of large signs and outdoor signs, please leave it to Mochizuki Nameplate Co., Ltd. in Shimizu Ward, Shizuoka City. 【Case Overview】 ■ Construction Period: August to October 2006 ■ Construction Duration: Approximately 3 months *For more details, please download the PDF or feel free to contact us.
- Company:望月ネームプレート
- Price:Other